2000 câu trắc nghiệm tổng hợp Tiếng Anh 2025 có đáp án (Phần 25)

To meet the increasing travel demands and reduce traffic congestion, the first 13-kilometre skytrain system, connecting Cat Linh and Ha Dong is (26)_______ and it is expected to be completed

16/62

 To meet the increasing travel demands and reduce traffic congestion, the first 13-kilometre skytrain system, connecting Cat Linh and Ha Dong is (26)_______ and it is expected to be completed by 2018.

pressed

launched

produced

announced

Giải thích

B. launched

Giải thích:

lauch: khởi động, khởi công